Advanced Work Packaging in capital projects: a standardized model for EPC Contractors

Antonio Calabrese, Marco Camaioni, Giovanni Piervincenzi

Abstract


The international context in which the major EPC Contractors operate is going through a period of profound transformation. The increasing complexity of the plants, the increasing costs of labor, the increasingly binding contractual requirements, have forced companies around the world to adapt to these market laws and raise the level of competitiveness through targeted business strategies. The main EP&C realities, national leader in the Oil & Gas sector, are constantly moving towards new process management techniques. The following work fits into this context by analyzing and deepening the process of breaking down the scope of work into the so-called Work Packages according to the Advanced Work Packaging methodology. AWP envisages a prioritization of the work, initially agreed between the various disciplines, with the ultimate aim of increasing performance in terms of time, cost, quality and alignment of the three macro-phases: Engineering, Procurement and Construction. After a thorough research on the previous bibliography, we analyzed the current process of management and decomposition of the scope of work. The result is an AWP application model, which, through modifications to the current management processes, provides a quantitative calculation tool to assess the amount of construction work related to a plant. The proposal is also extended to the engineering and procurement phase. This completely standardized process has a general validity and has been demonstrated through the application of two main projects. In the final part, the procedure was extended to all the types of systems made by Tecnimont, further demonstrating the extreme versatility of the methodology.

Keywords


Project management; EPC projects; construction; advanced work packaging

References


Ballard, H. G. (2000) The Last Planner System of production control, Faculty of Engineering of The University of Birmingham.

Bosch-Rekveldta, M.; Jongkindb, Y.; Mooia, H.; Bakkerc, H.; Verbraeckb, A. (2011) Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework, International Journal of Project Management, p. 728-739.

Caron, F. (2009) Gestione dei grandi progetti di ingegneria, Milano, ISEDI.

Construction Industry Institute (CII) & Construction Owners Association of Alberta Research (COAA) Joint Venture (2013) CII/COAA RT 272, IR272-2 volume 1: Advanced Work Packaging: Design through Workface Execution, The Construction Industry Institute, Austin.

Construction Industry Institute (CII) & Construction Owners Association of Alberta Research (COAA) Joint Venture (2013) CII/COAA RT 272IR 272-2 volume 2: Advanced Work Packaging: Design through Workface Execution, The Construction Industry Institute, Austin.

Construction Industry Institute (CII) & Construction Owners Association of Alberta Research (COAA) Joint Venture (2013) CII/COAA RT 272IR 272-2 volume 3: Advanced Work Packaging Implementation Case Studies & Expert Interviews, The Construction Industry Institute, Austin.

Dawood, N.; Sriprasert, E. (2006) Construction scheduling using multi-constraint and genetic algorithms approach, Construction Management and Economics 24(1), p. 19–30.

Hamdi, O. (2013) Advanced work packaging from project definition through site execution: driving successful implementation of workface planning, The University of Texas at Austin, Austin.

Insight-AWP (2017) Advanced Work Packaging service provider, Implementation of AWP processes and technology for our clients, [https://insight-awp.com/awp-procedures/].

Jortberg, R F. (1998) An Assessment of the Impact of CII, Construction Industry Institute.

Kim, S. B. (2014) Assessment of CII Best Practices usage in the construction industry, KSCE Journal of Civil Engineering, Vol. 18(5), p. 1228–1238.

Kim, S. B., Gibson, G. E. (2002) Assessment of CII knowledge implementation at the organization level, A Report to the Construction Industry Institute, Research Report 166-11, The University of Texas at Austin.

Merrow, E. W. (2012) Industrial Megaprojects: Concepts, Strategies, and Practices for Success, Wiley Online Library.

Pellegrino, S. P. (2018) Introduction to CII’s Advanced Work Packaging: An Industry Best Practice, Long International.

Project Management Institute (2017) Project Management Body of Knowledge 6th edition.

Slootman, T. (2007) Planning of Mega-Projects-Influence of Execution Planning on Project Performance, University of Twente.

Tommelein, I. (1998) Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique, Journal of Construction Engineering and Management, Vol. 124(4), p. 279-288.

Wang, J.; Shou, W.; Xiangyu Wang, X.; Wu, P. (2016) Developing and evaluating a framework of total constraint management for improving workflow in liquefied natural gas construction, Journal Construction Management and Economics, Vol. 34(12), p. 859–874.

Winch, G. M. (2006) Towards a theory of construction as production by projects, Building Research & Information, Vol. 34(2), p. 154–163.


Full Text: PDF

Refbacks

  • There are currently no refbacks.




______________________________________________________________________________

The Journal of Modern PM (ISSN: 2317-3963) | info@journalmodernpm.com