:::
Open Access Open Access  Restricted Access Subscription or Fee Access

Concurrent engineering in Brazilian construction companies: Maturity assessment

Soraya Mattos Pretti, João Luiz Calmon, Darli Rodrigues Vieira

Abstract


The purpose of this paper is to identify the maturity level of concurrent engineering in Brazilian construction companies in the Great Vitória region – Espírito Santo. This is a qualitative research study, which proposes a methodology based on semi-structured and structured interviews applied in Brazilian construction companies, using nine case studies in construction companies of Great Vitória (Espírito Santo, Brazil). The results confirm the appropriate methodology and confirm that the companies that were analyzed have, in general, a good and managed maturity level. The research also shows that the quality search initiated in the 1990’s in Brazil is valid, since quality was concurrent engineering’s most developed element in construction firms. However, there is still a lack of stakeholders’ integration and understanding of what a multidisciplinary team is and how it should work, which suggests that companies need to work harder in training and coordinating their teams. As the results show, it is also noticeable that certain firms’ characteristics, such as size, time in the market, centralization of decisions, among others, interfere in the level of maturity of concurrent engineering.

Keywords


Concurrent Engineering; Maturity Assessment; Project Management; construction

References


Addo-Tenkorang, R. (2011, October). Concurrent Engineering (CE): a review literature report. Paper presented at the II World Congress on Engineering and Computer Science, San Francisco, USA. Available at http://www.iaeng.org/publication/WCECS2011/WCECS2011_pp1074-1080.pdf

Anumba, C. J.; Kamara, J.; & Cutting-Decelle, A. F. (Eds.). (2007). Concurrent engineering in construction projects. New York: Taylor & Francis.

Beset, D. A. (2007) A model for assessing project management maturity level of architectural design offices (ARCH-PMM). (Doctoral dissertation – Izmir Institute of Technology). Available at http://library.iyte.edu.tr/tezler/doktora/mimarlik/T000666.pdf

Bogus, S. M.; Molenaar K. R.; & Diekmann, J. E. (2005). Concurrent engineering approach to reducing design delivery time. Journal of Construction Engineering and Management, Vol. 131, p. 1179-1185.

Bouer, R.; & Carvalho, M. M. (2005). Metodologia singular de gestão de projetos: condição suficiente para a maturidade em gestão de projetos? Revista Produção, Vol. 15, p. 347-361.

Brasiliano, A. E. (2000). Gestão do desenvolvimento de projetos das edificações públicas: um modelo segundo os princípios da engenharia simultânea. (Masters dissertation –Universidade Federal do Espírito Santo) Available at http://www.infohab.org.br/acervos/buscaautor/codigoAutor/3877

Bruel, A. A. (2003). Proposta de um roteiro para desenvolvimento do plano do empreendimento de forma integrada em empresas de construção civil. (Masters dissertation – Universidade Federal do Paraná). Available at http://www.ppgcc.ufpr.br/dissertacoes/d0027.pdf

Caixa Econômica Federal. (2012). Demanda Habitacional no Brasil. Retrieved from Caixa Econômica Federal website: http://downloads.caixa.gov.br/_arquivos/habita/documentos_gerais/demanda_habitacional.pdf

Calmon, J. L.; Nogueira-Campos, M. A.; & Pinto, M. M. (2008, October). O processo de adoção de novas tecnologias nas edificações: uma revisão bibliográfica. Paper presented at the XXVIII Encontro nacional de engenharia da produção, Rio de Janeiro, Brazil. Available at http://www.abepro.org.br/biblioteca/enegep2008_TN_STO_087_569_11729.pdf

Castro, M. P. B. (2010). Gestão do processo de projeto. (Masters dissertation – Universidade Federal de Goiás).

Conde, K. M. (2001). Qualidade de projeto em empresas construtoras: diagnóstico e recomendações. (Masters dissertation – Universidade Federal do Espírito Santo). Available at http://www.civil.ufes.br/node/15

Corrȇa, C. V. (2006). A aplicação da engenharia simultânea na dinâmica de elaboração e implantação de projetos para produção de alvenaria de vedação na construção civil. (Masters dissertation – Universidade Federal de Minas Gerais).

Corrȇa, C. V.;& Andery, P. R. P. (2006). Dificuldades para a implementação de projetos para a produção de alvenaria: um estudo de caso. Gestão & Tecnologia em projetos, Vol. 1, p. 104-125.

Crosslay, A. (2002). Frameworks for improvement. Construction Marketer, Vol. 1, p. 9-11.

de Graff, R.; & Sol, E. J. (1994). Assessing Europe’s readiness for concurrent engineering. Paper presented at the X Conference on concurrent engineering: research & applications, São Paulo, Brazil. Available at http://alexandria.tue.nl/repository/freearticles/425035.pdf

de Graaf, R.; Wognum, P. M.; Stoeten B. J. B.; & Kerkhof, M. (1996, August). PMO-RACE: A combined method for assessing organisations for CE. Paper presented at the III International Conference on concurrent engineering: research & applications, Ontario, Canada.

Eriksson, P. E.; Nilsson, T.; & Atkin, B. (2008). Client perceptions of barriers to partnering. Engineering, Construction and Architectural Management, Vol. 15, p. 527-539.

Evbuomwan, N. F. O.; & Anumba, C. (1997). Communications issues in concurrent life-cycle design and construction. BT Technology Journal, Vol. 15, p. 209-216.

Evbuomwan, N. F. O.; & Anumba, C. (1998). An integrated framework for concurrent life-cycle design and construction. Advances in Engineering Software, Vol. 29, p. 587-597.

Fabrício, M. M. (2002). O projeto simultâneo na construção de edifícios. (Doctoral dissertation – Universidade de São Paulo). Available at http://www.globalconstroi.com/images/stories/Manuais_tecnicos/2010/projecto_simultaneo_const_edificios/Projeto_Simultaneo_TESE1.pdf

Fabrício, M. M; & Melhado, S. B. (2000). Projeto simultâneo e a qualidade ao longo do ciclo de vida do empreendimento. Paper presented at the VIII Encontro nacional de technologia do ambiente construído, Salvador, Brazil.

Fabrício, M. M; & Melhado, S. B. (2002). Por um processo de projeto simultâneo. Paper presented at the II Workshop nacional: gestão do processo de projeto na construção de edifícios, Porto Alegre, Brazil. Available at http://www.eesc.usp.br/sap/projetar/files/A036.pdf

Fabrício, M. M; & Melhado, S. B. (2005). Integrated product development in the building construction: case studies in Brazilian building companies. Paper presented at the CIB W096 Conference - Designing Value: New directions in architectural management, 96, Copenhagen, Denmark.

Farris, P. W., Bendle, N. T.; Pfeifer, P. E.; & Reibstein, D. J. (2010). Marketing Metrics: the definitive guide to measuring marketing performance. New Jersey: Pearson Education Inc.

Fontenelle, E. C. (2002). Estudos de caso sobre a gestão do projeto em empresas de incorporação e construção. (Masters dissertation –Universidade de São Paulo). Available at http://www.planoauditoria.com.br/site/download/110908_gestaoempreendimetntos.pdf

Formoso, C. T.; Trescastro, M.; & Codinhoto, R. (2006). Planejamento e controle integrado do projeto e da produção em ambientes simultâneos na construção civil. Paper presented at the NUTAU: Arquitetura e Urbanismo– Inovações tecnológicas e sustentabilidade, São Paulo, Brazil. Available at http://www.gerenciamento.ufba.br/MBA%20Disciplinas%20Arquivos/Gestao%20Producao/Texto5UFBA2007%20Planejamento.pdf

Gunasekaran, A.; Love, P. E. D.; & Li, H. (1998). Concurrent engineering: a strategy for procuring construction projects. International Journal of Project Management, Vol. 16, p. 375-383.

Haas, C. (2009). An international perspective on construction competitiveness and productivity. In: Committee on advancing the competitiveness and productivity of the U.S. construction industry, National Research Council (Ed.), Issue advancing the competitiveness and efficiency of U.S. construction (p. 55-75). Washington, DC: The National Academies Press.

Instituto Brasileiro de Geografia e Estatística – IBGE. (2013). Pesquisa anual da indústria da construção 2011. Retrieved from Câmara Brasileira da Indústria da Construção website: http://www.cbicdados.com.br/media/anexos/PAIC2011.pdf

Kerzner, H. (2002) Advanced project management: best practices on implementation. Nova York: John Wiley & Sons.

Khalfan, M. M. A. (2001). Benchmarking and readiness assessment for concurrent engineering in construction (BEACON). (Doctoral dissertation – Loughborough University). Available at https://dspace.lboro.ac.uk/dspace-jspui/handle/2134/6925

Koskela, L. (1992). Technical Report, n. 72: Application of the new production philosophy to construction. Stanford: Stanford University/CIFE. Available at http://www.ce.berkeley.edu/~tommelein/Koskela-TR72.pdf

Kruglianskas, I. (1993). Engenharia Simultânea: organização e implantação em empresas brasileiras. Revista Administração, Vol. 28, p. 104-110.

Kwak, Y. H.; & Ibbs, C. W. (2002). Project Management Process Maturity (PM)² Model. Journal of Management in Engineering, Vol. 18, p. 150-155.

Marx, R. (2010, August 27). Gestão na construção civil. Catho. Retrieved from http://www.catho.com.br/carreira-sucesso/entrevistas/professor-roberto-marx-gestao-na-construcao-civil

McCormack, K.; & Lockamy, A. (2004). The development of a supply chain management process maturity model using the concepts of business process orientation. Supply Chain Management: An International Journal, Vol. 9, p. 272-278.

Melhado, S. B. (1994). Qualidade do projeto na construção de edifícios: aplicação ao caso das empresas de incorporação e construção. (Doctoral dissertation – Universidade de São Paulo).

Mikaldo Jr.; & Scheer, S. (2008). Compatibilização de projetos ou engenharia simultânea: Qual é a melhor solução? Gestão & tecnologia de projetos, Vol. 3, p. 79-99.

Mitchell, A.; Frame, I.; Coday, A.; & Hoxley, M. (2011). A conceptual framework of the interface between the design and construction processes. Engineering, Construction and Architectural Management, Vol. 18, p. 297-311.

Mohamad, I. M.; Baldwin, A. N.; & Yahya, K. (2008). Application of concurrent engineering (CE) for construction industry. In: I.M. Mohamad (Ed.). Issues in construction industry (p.9-24). Malásia: UTM Press.

Nightingale D. J.; & Mize, J. H. (2002). Development of a lean enterprise transformation maturity model. Supply Chain Management: An International Journal, Vol. 3, p. 15-30.

Noro, G. B.; Abbade, E. B.; Siluk, J.; & Bianchi, R. C. (2008). A maturidade em gestão de projetos das empresas de construção civil de Santa Maria – RS. Paper presented at the XXVIII Encontro nacional de engenharia de produção, Rio de Janeiro, Brazil. Available at files.greice-noro.webnode.com.br/ .../enegep2008_maturidade.pdf‎

Panizzolo, R.; Biazzo, S.; & Garengo, P. (2010). New product development assessment: towards a normative-contingent audit. Benchmarking: An International Journal, Vol. 17, p. 173-194.

Pedrini, M. K. (2012). Engenharia Simultânea: planejamento e controle integrado do processo de produção/projeto na construção civil. (Masters dissertation –Universidade Federal do Espírito Santo) Available at http://www.civil.ufes.br/node/15

Robbins, S. P. (2006). Comportamento organizacional. São Paulo: Pearson Prentice Hall.

Santos, L. G. C.; & Martins, M. R. (2008). Evoluindo na maturidade em gerenciamento de projetos e empreendimentos - caso do governo do Estado do Rio de Janeiro. Paper presented at the XXVIII Encontro nacional de engenharia de produção, Rio de Janeiro, Brazil. Available at http://www.abepro.org.br/biblioteca/enegep2008_TN_STP_076_538_10958.pdf

Serviço Brasileiro de Apoio às Micro e Pequenas Empresas – SEBRAE. (n.d.). Critérios de classificação de empresas. Retrieved June 17, 2013, from SEBRAE Santa Catarina website, http://www.sebrae-sc.com.br/leis/default.asp?vcdtexto=4154

Shouke, C.; Zhuobin, W.; & Jie, L. (2010). Comprehensive evaluation for construction performance in concurrent engineering environment. International Journal of Project Management, Vol. 28, p. 708-718.

Silva, A. T. S. P. (2010). Maturidade do processo de planejamento e controle da produção baseada nos princípios da construção enxuta: Caso de uma empresa construtora capixaba. (Masters dissertation – Universidade Federal do Espírito Santo). Available at http://www.civil.ufes.br/node/15

The Role and mission of the construction client. (2006). Retrieved from Estocolmo: Byggherre forum’s working group for R&D and university relations, http://www.byggherre.se/

Vaidyanathan, K.; & Howell, G. (2007). Construction supply chain maturity model – conceptual framework. Paper presented at the XV Annual Conference of the International Group for Lean Construction Michigan, USA. Available at http://www.academia.edu/1339658/Construction_supply_chain_maturity_model_conceptual_framework


Full Text: PDF

Refbacks

  • There are currently no refbacks.




______________________________________________________________________________

The Journal of Modern PM (ISSN: 2317-3963) | info@journalmodernpm.com