A Comprehensive Assessment of Project Success Within Various Large Projects

Azadeh Rezvani, Pouria Khosravi

Abstract


Large scale projects are important drivers of social change. Even when operations follow best practices there are serious challenges, which all too often lead to failure in large scale projects. However, while large scale project success and failure have been widely studied there is no comparison of project success in large scale projects across different types of projects. This study reveals project success factors in the context of large scale projects by analysing 30 articles.  This review systematically identifies and compares project success factors in three types of large scale projects: construction/infrastructure, aerospace/defence, and information technology. The paper offers practitioners and researchers a more comprehensive understanding of success in managing large scale projects and useful recommendations for future research.

Keywords


Project success, Large scale projects, Critical success factors, Systematic review, Project performance, Iron triangle, Construction project, Defense project, Engineering projects, Information technology project, Infrastructure project

References


Adoko, M. T., Mazzuchi, T. A., & Sarkani, S. (2015). Developing a cost overrun predictive model for complex systems development projects. Project Management Journal, 46(6), 111-125.

Ahern, T., Leavy, B., & Byrne, P. J. (2014). Large scale project management as large scale problem solving: A distributed knowledge management perspective. International Journal of Project Management, 32(8), 1371-1381.

Akkermans, H., & van Oorschot, K. E. (2016). Pilot Error? Managerial decision biases as an explanation for disruptions in aircraft development. Project Management Journal, 47(2), 79-102.

Alshawi, M., Goulding, J., Al Nahyan, M. T., Sohal, A. S., Fildes, B. N., & Hawas, Y. E. (2012). Transportation infrastructure development in the UAE: Stakeholder perspectives on management practice, Construction Innovation, 12(4), 492-514

Art Gowan Jr, J., & Mathieu, R. G. (2005) The importance of management practices in IS project performance: An empirical study. Journal of Enterprise Information Management, 18(2), 235-255

Bosch-Rekveldt, M., Jongkind, Y., Mooi, H., Bakker, H., & Verbraeck, A. (2011). Grasping project large scaleity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework. International Journal of Project Management, 29(6), 728-739

Brady, T., & Davies, A. (2014). Managing structural and dynamic large scaleity: A tale of two projects. Project Management Journal, 45(4), 21-38.

Braun, V., and Clarke, V. (2006). Using thematic analysis in psychology. Qualitative Research in Psychology, 3(2), 77-101

Chua, C. E. H., Lim, W.-K., Soh, C., & Sia, S. K. (2012). Enacting clan control in large scale IT projects: A social capital perspective. MIS Quarterly-Management Information Systems, 36 (2), 577-601.

Cooke-Davies, T. (2002). The “real” success factors in projects. International Journal of Project Management 20(3), 185–190.

Davis, K. (2014). Different stakeholder groups and their perceptions of project success. International Journal of Project Management, 32(2), 189-201

Davies, A., & Mackenzie, I. (2014). Project large scaleity and systems integration: Constructing the London 2012 Olympics and Paralympics Games. International Journal of Project Management, 32(5), 773-790.

Dey, I. (2003) Qualitative data analysis: A user friendly guide for social scientists. Routledge, New York, NY, 10001.

Dimitriou, H. T., Ward, E. J., & Wright, P. G. (2013). Mega transport projects—Beyond the ‘iron triangle’: Findings from the OMEGA research programme. Progress in Planning, 86(3), 1-43

Dvir, D., Ben-David, A., Sadeh, A., & Shenhar, A. J. (2006). Critical managerial factors affecting defence projects success: A comparison between neural network and regression analysis. Engineering Applications of Artificial Intelligence, 19(5), 535-543

Eriksson, P. E., Larsson, J., & Pesämaa, O. (2017). Managing large scale projects in the infrastructure sector—A structural equation model for flexibility-focused project management’, International Journal of Project Management, 35(8), 1512-1523

Ferratt, T. W., Ahire, S., & De, P. (2006). Achieving success in large projects: Implications from a study of ERP implementations. Interfaces, 36(5), 458-469

Flyvbjerg, B. (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2), 6-19

Flyvbjerg, B. (2008). Curbing optimism bias and strategic misrepresentation in planning: Reference class forecasting in practice. European Planning Studies, 16(1), 3-21

Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003). Megaprojects and risk: An anatomy of ambition. Cambridge University Press.

Flyvbjerg, B., Stewart, A., & Budzier, A. (2016). The Oxford Olympics Study 2016: Cost and Cost Overrun at the Games. Said Business School WP 2016-20. Available at SSRN: https://ssrn.com/abstract=2804554

GAPPS, (2007). A framework for performance based competency standards for global level 1 and 2 project managers Global Alliance for Project Performance Standards.

Giezen, M. (2012). Keeping it simple? A case study into the advantages and disadvantages of reducing large scaleity in mega project planning. International Journal of Project Management, 30(7), 781-790

Guest, G., MacQueen, K. M., & Namey, E. E. (2011). Applied thematic analysis. Sage, London, UK.

Han, S. H., Yun, S., Kim, H., Kwak, Y. H., Park, H. K., & Lee, S. H. (2009). Analyzing schedule delay of mega project: Lessons learned from Korea train express. IEEE Transactions on Engineering Management, 56(2), 243-256

Hartmann, A., Ling, F. Y. Y., & Tan, J. S. (2009). Relative importance of subcontractor selection criteria: Evidence from Singapore. Journal of Construction Engineering and Management, 135(9), 826-832

Hogg, M.A., Van Knippenberg, D. & Rast, D.E. (2012). Intergroup leadership in organizations: Leading across group and organizational boundaries. Academy of Management Review, 37 (2), 232-255

Hui, P. P., Davis‐Blake, A., & Broschak, J. P. (2008). Managing interdependence: The effects of outsourcing structure on the performance of large scale projects. Decision Sciences, 39(1), 5-31

Hyväri, I. (2006). Success of projects in different organizational conditions. Project Management Journal, 37(4), 31–42

Ika, L. (2009). Project success as a topic in project management journals. Project Management Journal, 40(4), 6–19

Janssen, M., Van Der Voort, H., & van Veenstra, A. F. (2015). Failure of large transformation project from the viewpoint of large scale adaptive systems: Management principles for dealing with project dynamics. Information Systems Frontiers, 17(1), 15-29

Jørgensen, M., & Moløkken-Østvold, K. (2006). How large are software cost overruns? A review of the 1994 CHAOS report. Information and Software Technology, 48(4), 297-301.

Jugdev, K., & Müller, R. (2005). A retrospective look at our evolving understanding of project success. Project Management Journal, 36(4), 19-31.

Kardes, I., Ozturk, A., Cavusgil, S. T., & Cavusgil, E. (2013). Managing global megaprojects: Large scaleity and risk management. International Business Review, 22 (6), 905-917.

Karlsen, J. T., Andersen, J., Birkely, L. S., & Ødegård, E. (2005). What characterizes successful IT projects. International Journal of Information Technology & Decision Making, 4 (04), 525-540

Kendra, K., & Taplin, L. J. (2004). Project success: A cultural framework. Project Management Journal, 35(1), 30-45

Kent, D. C., & Becerik-Gerber, B. (2010). Understanding construction industry experience and attitudes toward integrated project delivery. Journal of Construction Engineering and Management, 136(8), 815-825

Kerzner, H. (1987). In search of excellence in project management. Journal of Systems Management, 38(2), 30-51

Khosravi, P., Rezvani, A., Subasinghage, M., & Perera, M. (2012). Individuals' absorptive capacity in enterprise system assimilation. In ACIS 2012: Location, location, location: Proceedings of the 23rd Australasian conference on information systems 2012 (pp. 1-7). ACIS.

Khosravi, P., Rezvani, A., & Ahmad, M. N. (2013). Does organizational identification lead to information system success. World Applied Sciences Journal, 21(3), 402-408.

Khosravi, P., Rezvani, A., & Wiewiora, A. (2016). The impact of technology on older adults’ social isolation. Computers in Human Behavior, 63, 594-603.

Kwak, Y. H., & Smith, B. M. (2009). Managing risks in mega defence acquisition projects: Performance, policy, and opportunities. International Journal of Project Management, 27 (8), 812-820

Lech, P. (2013). Time, budget, and functionality?—IT project success criteria revised. Information Systems Management, 30(3), 263-275

Levy, Y., & Ellis, T. J. (2006). A systems approach to conduct an effective literature review in support of information systems research. Informing Science: International Journal of an Emerging Transdiscipline, 9(1), 181-212

Liu, L., & Leitner, D. (2012). Simultaneous pursuit of innovation and efficiency in large scale engineering projects—A study of the antecedents and impacts of ambidexterity in project teams. Project Management Journal, 43(6), 97-110

Liu, S., & Wang, L. (2016). Influence of managerial control on performance in medical information system projects: The moderating role of organizational environment and team risks. International Journal of Project Management, 34(1), 102-116

Liu, Z., Zhu, Z., Wang, H., & Huang, J. (2016). Handling social risks in government-driven mega project: An empirical case study from West China. International Journal of Project Management, 34(2), 202-218

Locatelli, G., & Mancini, M. (2012). Looking back to see the future: Building nuclear power plants in Europe. Construction Management and Economics, 30(8), 623-637

Locatelli, G., Mancini, M., & Romano, E. (2014). Systems engineering to improve the governance in large scale project environments. International Journal of Project Management, 32(8), 1395-1410

Long, N. D., Ogunlana, S., Quang, T., & Lam, K. C. (2004). Large construction projects in developing countries: A case study from Vietnam. International Journal of Project Management, 22(7), 553-561

Lyneis, J. M., Cooper, K. G., & Els, S. A. (2001). Strategic management of large scale projects: A case study using system dynamics. System Dynamics Review, 17(3), 237-260

McGillivray, S., Greenberg, A., Fraser, L., & Cheung, O. (2009). Key factors for consortial success: Realizing a shared vision for interlibrary loan in a consortium of Canadian libraries’, Interlending & Document Supply, 37(1), 11-19

Mok, K. Y., Shen, G. Q., & Yang, J. (2015). Stakeholder management studies in mega construction projects: A review and future directions. International Journal of Project Management, 33(2), 446-457

Molloy, E., & Chetty, T. (2015). The rocky road to legacy: Lessons from the 2010 FIFA World Cup South Africa stadium program. Project Management Journal, 46(3), 88-107

Morgan, G., & Smircich, L. (1980). The case for qualitative research. Academy of management review, 5(4), 491-500

Müller, R., & Jugdev, K. (2012). Critical success factors in projects: Pinto, Slevin, and Prescott-The elucidation of project success. International Journal of Managing Projects in Business, 5(4), 757-775

Müller, R., & Turner, R. (2007). The influence of project managers on project success criteria and project success by type of project. European Management Journal, 25(4), 298-309

Neuendorf, K. A. (2002). The content analysis guidebook. Sage, London, UK.

Ogunlana, S. O. (2008). Critical COMs of success in large-scale construction projects: Evidence from Thailand construction industry. International Journal of Project Management, 26(4), 420-430

Patanakul, P. (2014). Managing large-scale IS/IT projects in the public sector: Problems and causes leading to poor performance. The Journal of High Technology Management Research, 25 (1), 21-35

Pinto, J. K., & Slevin, D. P. (1987). Critical factors in successful project implementation. Engineering Management, IEEE Transactions, 1 3, 22-27

Remington, K., & Pollack, J. (2007). Tools for large scale projects. Gower Publishing, Ltd, Hampshire.

Rezvani, A., Chang, A., Wiewiora, A., Ashkanasy, N. M., Jordan, P. J., & Zolin, R. (2016). Manager emotional intelligence and project success: The mediating role of job satisfaction and trust’, International Journal of Project Management, 34(7), 1112-1122

Rezvani, A., Khosravi, P., Subasinghage, M., & Perera, M. (2012). How does contingent reward affect enterprise resource planning continuance intention? The role of contingent reward transactional leadership. In ACIS 2012: Location, location, location: Proceedings of the 23rd Australasian Conference on Information Systems 2012 (pp. 1-9). ACIS.

Rezvani, A., Dong, L., & Khosravi, P. (2017). Promoting the continuing usage of strategic information systems: The role of supervisory leadership in the successful implementation of enterprise systems. International Journal of Information Management, 37(5), 417-430.

Rezvani, A., Khosravi, P., & Dong, L. (2017). Motivating users toward continued usage of information systems: Self-determination theory perspective. Computers in Human Behavior, 76, 263-275.

Rezvani, A., Chang, A., &Wiewiora, A. (2015). Emotional intelligence, work attitudes and project success: An examination among project managers in complex projects.

Rezvani, A., Chang, A., & Wiewiora, A. (2016). Project success in complex projects: A systematic literature review.

Ritchie, J., Lewis, J., Nicholls, C. M., & Ormston, R. (Eds.). (2013). Qualitative research practice: A guide for social science students and researchers. Sage, London, UK.

Robinson Fayek, A., Revay, S. O., Rowan, D., & Mousseau, D. (2006). Assessing performance trends on industrial construction mega projects. Cost Engineering, 48(10), 16-21

Robinson, C. (2002). Real world research: A resource for social scientists and practitioner-researchers. (2nd Ed.). Oxford: Blackwell Publishers Ltd.

Sauer, C., Gemino, A., & Reich, B. H. (2007). The impact of size and volatility on IT project performance. Communications of the ACM, 50(11), 79-84

Savolainen, P., Ahonen, J. J., & Richardson, I. (2012). Software development project success and failure from the supplier's perspective: A systematic literature review. International Journal of Project Management, 30(4), 458-469.

Slywotzky, A., & Wise, R. (2003). The dangers of product-driven success: What's the next growth act? Journal of Business Strategy, 24(2), 16-25.

Söderlund, J., & Lenfle, S. (2013). Making project history: Revisiting the past, creating the future. International Journal of Project Management, 31(5), 653-662

Somech, A., Desivilya, H. S., & Lidogoster, H. (2009). Team conflict management and team effectiveness: The effects of task interdependence and team identification. Journal of Organizational Behavior, 30(3), 359-378

Tai, S., Wang, Y., & Anumba, C. (2009). A survey on communications in large-scale construction projects in China. Engineering, Construction and Architectural Management, 16(2), 136-149

Toor, S.-U.-R., & Ogunlana, S. O. (2009a). Construction professionals' perception of critical success factors for large-scale construction projects. Construction Innovation. 9(2), 149-167

Toor, S.-U.-R., & Ogunlana, S. (2009b) Ineffective leadership: Investigating the negative attributes of leaders and organizational neutralizers. Engineering, Construction and Architectural Management, 16(3), 254-272.

Toor, S.-U.-R., & Ogunlana, S. O. (2010). Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects. International Journal of Project Management, 28(3), 228-236.

Tranfield, D., Denyer, D., & Smart, P. (2003). Towards a methodology for developing evidence informed management knowledge by means of systematic review. British Journal of Management, 14(3), 207-222.

Rezvani, A., Chang, A., & Wiewiora, A. (2016). A taxonomy of project barriers in complex projects.

Turner, R., & Zolin, R. (2012). Forecasting success on large projects: Developing reliable scales to predict multiple perspectives by multiple stakeholders over multiple time frames. Project Management Journal, 43(5), 87-99.

Venkatesh, V., Morris, M. G., Davis, G. B., & Davis, F. D. (2003). User acceptance of information technology: Toward a unified view. MIS Quarterly, 27(3), 425-478.

Williams, T. (2016). Identifying success factors in construction projects: A case study. Project Management Journal, 47(1), 97-112.

Whitty, S. J., & Maylor, H. (2009). And then came large scale project management (revised). International Journal of Project Management, 27(3), 304-310.

Yang, J., Shen, G. Q., Ho, M., Drew, D. S., & Xue, X. (2011). Stakeholder management in construction: An empirical study to address research gaps in previous studies. International Journal of Project Management, 29(7), 900-910.

Yau, N.-J., & Yang, J.-B. (2012). Factors causing design schedule delays in turnkey projects in Taiwan: An empirical study of power distribution substation projects. Project Management Journal, 43(3), 50-61.

Yetton, P., Martin, A., Sharma, R., & Johnston, K. (2000) A model of information systems development project performance’, Information Systems Journal, 10(4), 263-289.

Zhang, L., & Fan, W. (2013). Improving performance of construction projects: A project manager's emotional intelligence approach. Engineering, Construction and Architectural Management, 20(2), 195-207.


Full Text: PDF

Refbacks

  • There are currently no refbacks.




______________________________________________________________________________

The Journal of Modern PM (ISSN: 2317-3963) | info@journalmodernpm.com