Incidence in Licensing Management Activities in Building Project Life Cycle: A Strategic Matter of Knowledge

Adolfo García Ruiz-Espiga, Manuel José Soler Severino, Antonio Humero Martín

Abstract


The architectural project faces the challenge of the constant search of improving productivity, and the optimization of processes. This requires detailed analysis of processes, in such a way that we can identify where there are relatively more incidents, and of these, those that have the greatest impact on the development of the project.

The purpose of this research was to evaluate the impact of the incidents of the Licensing Management activities in the phases of the life cycle of the building project.

The data here in has been obtained from the analysis of projects carried out in the city of Madrid, taken specifically as a reference given the complexity of its regulations.

The study identifies the degree of impact in each of the project phases, and the results justify the proposal of a new role in the project team, and because of its strategic importance, of a specific chapter in the reference standards

Keywords


Licensing Management; License Management; Project Management, Building Authorizations; Risk Management

References


AENOR; UNE-ISO 21500:2013 "Guidance on project management"

Bernus, P.; Nemes, L. (2003), Introduction (capítulo 1), en "Handbook of Enterprise Architectur"e (Bernus, P.; Nemes, L.; Schmidt, G., editores), Springer-Verlag, Berlin Heidelberg, Alemania

Barrie, D., Paulson, B., “Professional Construction Management”, Ed. Mc Graw-Hill, 1992

Cooke-Davies, T. J., Crawford, L. H. and Lechler, T. G. (2009), Project management systems: Moving project management from an operational to a strategic discipline. Proj Mgmt Jrnl, 40: 110–123. doi:10.1002/pmj.20106

Cholbi Cachá, F.A. “El procedimiento de concesión de las licencias de urbanismo”. El Consultor de los Ayuntamientos y de los Juzgados. 2002

Carrasco Pereda, A. “Comentarios a la Legislación de Ordenación de la Edificación”. Ed. Aranzadi 2011

De Heredia Scasso, R. “ Gerencia de Riesgos en proyectos de construcción” Dirección Integrada de Proyecto; Universidad Politécnica de Madrid. Escuela Técnica Superior deIngenieros Industriales. Sección de Publicaciones 978-84-7484-108-4

Fernández Torres, J.R. (2011), “Regímenes de intervención administrativa: autorización, comunicación previa y declaración responsable”. Revista Catalana d Derecho Público. (2011- Nº42)

García Ruiz-Espiga, A. (2010), “Time Management y el nuevo modelo de gestión público-privada de las licencias de actividad en Madrid”. Revista“Project Management”. Grupo Vía .28/2010, AEDIP, Barcelona 2010

Giacomello, H. & Gonzalez Stumpf, M.A. & Parisi Kern Andrea (2014) “Implementation of an Integrated Management System into a small building company” Revista de la Construcción;2014 nº13(3); ISSN 0717-7925

Harty, C. & Leiringer, L. (2017). “The future of construction management research”. Construction Management and Economics, Vol.35, No.7, 392-403

Hyvri, I. (2006). “Success of projects in different organizational conditions”.Project Management Journal, 37(4), 31–41

Kedir Mohammed, H. & Knapkova, A. (2016) “ The impact of Total Risk Management on company´s performance”; 19th International Conference Enterprise and Competitive Environment 2016, ECE 2016, 10–11 March 2016, Brno, Czech Republic; 2016. Published by Elsevier Ltd

L. Crosby, B. (1991) “ Stakeholder Analisys: A vital tool for strategic managers” USAID´s Implementing Policy Change Project; March 1991

Mesa Fernández, J.M. & Palacios González, C. & Alvarez Cabal, V. & Villanueva Balsera, (2016) J. “Analysis of the quality control planning in residential construction projects in Spain” Revista de la Construcción;2016 nº15(2); ISSN 0717-7925

Maury Ramírez, H.E., & Luna, C., & Romeva, C. “El concepto de Ciclo de Vida” Academia.edu/23091822

Nevins, J.L, Whitney, D.E. (Editores) (1989), Concurrent Design of Product and Process, MacGraw Hill, New York

Narváez Rosero, M.P. “Risk Management in the Desing Phase for construction projects using the Pmbok Guide”

PROJECT MANAGEMENT INSTITUTE (PMI), PMBoK “Project Managemet Body of Knowledge”. Ed.PMI 5th. EEUU

--------- “Construction Extension to the PMBoK”. Ed.PMI 5th. EEUU

Rocha, L.A. & Gama Ponce, T.( 2006); “Costos preliminares en proyectos de edificación” 2006

Rasmussen, J. & Svenung, I. “Proactive Risk Management in a Dynamic Society” ISBN 91-7253-084-7

Royal Institute of British Architects ; "Plan of Work"; 2013

Rodríguez Santoyo, A. R. " Fundamento de Mercadotecnia"; Fundación Universitaria Andaluza Inca Garcilaso para eumed.net; 2013

Soler Severino, M.J. & Humero Martín, A.E. (2013) “Análisis de la Dirección Integrada de Proyectos de Construcción («Project and Construction Management») en el ámbito jurídico español”. Revista Aranzadi de Urbanismo y Edificación (RUE). Editorial Aranzadi Thomson Reuters. ISSN: 1576-9380. Nº 27. Enero-abril 2013. Pág. 331-355

-------- “El Libro del Facilities Management”. Cap. 4 “Project Management” Ed. SLFM. Buenos Aires 2012

--------“Manual para el Director de Proyectos de Construcción- Project and Construction Manager”. Mairea Libros. 2013

Triviño Barros, G. (2003) “El edificio como un sistema de gestión de información”;Informes de la Construcción. Vol. 55. Nº 488. Noviembre-diciembre 2003


Full Text: PDF