Open Access Open Access  Restricted Access Subscription or Fee Access

The Motives for and Consequences of Underpricing for Construction Contractors—Evidence from Australia

Li Liu, Paul L. Bannerman, Xiang Ding, Emma-Jane Elliott, Georgina Ewart, Xiaoying Kong

Abstract


Over the period of 2011-2013, there was a spate of bankruptcies of medium-to-large Australian construction contractors (many of whom were well-established), coinciding with a prolonged decline of the property market. Anecdotal evidence suggests that underpricing played a major role in the collapse of these companies and the financial misfortune of many major Australian construction contractors. On the other hand, anecdotal evidence also suggests that underpricing can be an effective tactic to penetrate markets or weaken competitors when used as part of a strategic mix—a double-edged sword. Because of the political sensitivity of the topic of underpricing, there has been a dearth of research in this area. This study investigates the extent and consequences of the practice of underpricing (in the Australian context), where it is defined as the submission of a tender price at a significantly lower level than the best estimate for the costs, profit margins, and risks of the construction project.

Drawing from the literature on construction tender-price formulation, we develop a framework that separates the motives for underpricing into need-for-work and marketing-based competitive pricing; and predict the consequences of the practice of underpricing in terms of adverse financial consequence or profitability in circumstances driven by the two different motives. The framework is validated through data analysis based on a survey of the members of the Australian Institute of Quantity Surveyors and randomly selected large contractors.

Underpricing was found to be prevalent in construction projects. Contributing to the literature, the results show that when underpricing is primarily driven by a contractor’s need for work to maintain cash flow; underpricing contractors are likely to engage in deceptive practices, such as submission of unwarranted variations or reducing the standard of work. Further, the findings indicate that, although such deceptive conduct could lead to short-term relief of adverse financial outcomes, it does not contribute to the competitiveness of the company in the longer term. By contrast, underpricing driven by deliberate marketing strategies, such as market penetration or to weaken competitors, was found to be linked with long-term financial profitability of the contractor.


Keywords


Underpricing; strategic misrepresentation; deception; tendering; project bidding; pricing strategy; construction

References


Ahmad, I., & Minkarah, I. (1988). Questionnaire survey on bidding in construction. Journal of Management in Engineering, 4(3), 229–243.

Akintoye, A. S., & Skitmore, M. (1990). Analysis of UK tender price levels. Transactions, 34th Annual Meeting of American Association of Cost Engineers, Boston, MA, 7.1–7.7.

Akintoye, A., & Skitmore, M. (1992). Pricing approaches in the construction industry. Industrial Marketing Management, 21(4), 311–318.

Alexandersson, G., & Hutlen, S. (2006). Predatory bidding in competitive tenders: A Swedish case study. European Journal of Law and Economics, 22(1), 73–73.

Arditi, D., Koksal, A., & Kale, S. (2000). Business failures in the construction industry. Engineering Construction & Architectural Management, 7(2), 120–132.

Assael, H. (1985). Marketing management: Strategy and action, Boston, MA: Kent Publishing.

Blake Dawson. (2011). Scope for Improvement 2011: Project Risk–Getting the right balance and outcomes. Melbourne, VIC, AU

Borden, N. H. (1984). The concept of the marketing mix. Journal of Advertising Research, 24(4), 7–12.

Chan, A. P. C., & Yeong, C. M. (1995). A comparison of strategies for reducing variations. Construction Management and Economics, 13(6), 467-473.

Chan, S. M., Runeson, G., & Skitmore, M. (1996). Changes in profit as market conditions change: An historical study of a building firm. Construction Management & Economics, 14(3), 253–264.

De Neufville, R., & King, D. (1991). Risk and need-for-work premiums in contractor bidding. Journal of Construction Engineering and Management, 117(4), 659–673.

De Neufville, R., Lesage, Y., & Hani, E. N. (1977). Bidding models: Effects of bidders’ risk aversion. Journal of the Construction Division, 103(1), 57–70.

Dulaimi, M. F., & Shan, H. G. (2002). The factors influencing bid mark-up decisions of large-and medium-size contractors in Singapore. Construction Management & Economics, 20(7), 601–610.

Dyer D. and Hagel, J. H. (1996). Bidding in common value auctions: How the commercial construction industry corrects for the winner's curse. Management Science, 42(10), 1463–1475.

Fayek, A., Ghoshal, I., & AbouRizk, S. (1999). A survey of the bidding practices of Canadian civil engineering construction contractors. Canadian Journal of Civil Engineering, 26(1), 13–25.

Fayek, A., Young, D. M., & Duffield, C. F. (1998). A survey of tendering practices in the Australian construction industry. Engineering Management Journal, 10(4), 29–34.

Flyvbjerg, B. (2005). Policy and Planning for Large Infrastructure Projects: Problems, Causes, Cures. World Bank: Washington, DC, USA.

Flyvbjerg, B. (2006a). Five misunderstandings about case-study research. Qualitative Inquiry, 12(2), 219–245.

Flyvbjerg, B. (2006b). From nobel prize to project management: Getting risks right. Project Management Journal, 37(3), 5–15.

Flyvbjerg, B., Holm, M. S., & Buhl, S. (2002). Underestimating costs in public works projects: Error or lie? Journal of the American Planning Association, 68(3), 279–295.

Flyvbjerg, B., Skamris Holm, M. K., & Buhl, S. L. (2003). How common and how large are cost overruns in transport infrastructure projects? Transport Reviews, 23(1), 71–88.

Friedman, L. (1956). A competitive-bidding strategy. Operations Research, 4(1), 104–112.

Fu, W. K., Drew, D. S., & Lo, H. P. (2003). Competitiveness of inexperienced and experienced contractors in bidding. Journal of Construction Engineering and Management, 129(4), 388–395.

Hauser, J. R. (1984). Pricing theory and the role of marketing science. Journal of Business, 57(1), S65–S71.

Industry Commission. (1991). Construction costs of major projects. Report no. 8, 11 March 1991. , Canberra: Australian Government Publishing Service.

Kangari, R. (1988). Business failure in construction industry. Journal of Construction Engineering and Management, 114(2), 172–190.

Kotler, P. (2000). Marketing management. New Jersey: Prentice-Hall.

Langford, D., Iyagba, R., & Komba, D. M. (1993). Prediction of solvency in construction companies. Construction Management and Economics, 11(5), 317–325.

Lanzillotti, R. F. (1958). Pricing objectives in large companies. American Economic Review, 48(5), 921–940.

LePatner, B. B. (2008). Broken buildings, busted budgets: How to fix America's trillion-dollar construction industry. Chicago: University of Chicago Press.

Ling, F. Y. Y. (2005). Global factors affecting margin-size of construction projects. Journal of Construction Research, 6(1), 91–106.

Mahamid, I. (2012). Factors affecting contractor's business failure: Contractors’ perspective. Engineering Construction & Architectural Management, 19(3), 226–285.

Marn, M. V., Roegner, E. V., & Zawada, C. C. (2004). The price advantage. New Jersey: John Wiley & Sons.

McCaffer, R., McCaffrey, M. J., & Thorpe, A. (1983). The disparity between construction cost and tender price movements. Construction Papers, 2(2), 17–27.

Mochtar, K., & Arditi, D. (2001). Pricing strategy in the US construction industry. Construction Management & Economics, 19(4), 405–415.

Nagle, T. T., & Hogan, J. E. (2006). The strategy and tactics of pricing. New Jersey: Pearson.

Oo, B., Drew, D., & Runeson, G. (2010). Competitor analysis in construction bidding. Construction Management & Economics, 28(12), 1321–1329.

Oo, B., Lo, H.-P., & Lim, B. T.-H. (2012). The effect of bidding success in construction bidding. Engineering, Construction and Architecture Management, 19(1), 25–39.

Papadakis, M. (2012, November 15). Building slump claims another victim. Australian Financial Review, 44.

Phillips, R. (2005). Price and revenue optimization. Stanford, CA: Stanford University Press.

Porter, M. E. (1996). What is strategy?" Harvard Business Review, 74(6), 61–80.

Runeson, K. G. (1988). Methodology and method for price-level forecasting in the building industry. Construction Management & Economics, 6(1), 49–55.

Runeson, K. G., & Skitmore, M. (1999). Tendering theory revisited. Construction Management & Economics, 17(3), 285–296.

Rwelamila, P. D., Lobelo, L., & Kupakuwana, P. S. (2004). Insolvencies among civil engineering enterprises in South Africa: A time to reflect. Cost Engineering, 46(7), 12–14.

Shash, A. A. (1993). Factors considered in tendering decisions by top UK contractors. Construction Management & Economics, 11(2), 111.

Siemiatycki, M. (2009). Academics and auditors. Journal of Planning Education and Research, 29(2), 142–156.

Skitmore, M. (1991). The construction contract bidder homogeneity assumption: An empirical test. Construction Management and Economics, 9(5), 403–429.

Skitmore, M., & Runeson, G. (2006). Bidding models: Testing the stationarity assumption. Construction Management & Economics, 24(8), 791–803.

Skitmore, M., Runeson, G., & Chang, X. (2006). Construction price formation: Full-cost pricing or neoclassical microeconomic theory? Construction Management & Economics, 24(7), 773–783.

Skitmore, M., & Smyth, H. (2007). Pricing construction work: A marketing viewpoint. Construction Management & Economics, 25(6), 619–630.

Smith, G. R., & Bohn, C. M. (1999). Small to medium contractor contingency and assumption of risk. Journal of Construction Engineering and Management, 125(2), 101–108.

Smyth, H. J. (2000). Marketing and selling construction services. Oxford: Blackwell Science.

Stone, P. A. (1983). Building economy: Design, production and organisation: A synoptic view. Oxford and New York: Pergamon Press.

Wanous, M., Boussabaine, A. H., & Lewis, J. (2000). To bid or not to bid: A parametric solution. Construction Management & Economics, 18(4), 457–466.

Yao, D.A. (1988). Beyond the reach of the invisible hand: Impediments to economic activity, market failures, and profitability. Strategic Management Journal, 9(1), 59–70.

Yiu, C. Y., & Tam, C. S. (2006). Rational under‐pricing in bidding strategy: A real options model. Construction Management and Economics, 24(5), 475–484.


Full Text: PDF

Refbacks

  • There are currently no refbacks.




______________________________________________________________________________

The Journal of Modern PM (ISSN: 2317-3963) | info@journalmodernpm.com